文献知网节
  • 记笔记
摘要:Junchang Tunnel passes through fault fracture zone where joints and fracture developed, the water-rich zone is wide and the geological condition is extremely complex, which is likely to induce the water gushing and mud gushing. Based on the project, the proper thickness of curtain grouting ring for the life-cycle of tunnel in water-rich fault fracture zone is analyzed, and the main conclusions are as follows:(1) Comprehensive advance geological forecast including ultra-high density resistance method, land sonar method, transient electromagnetic method and drilling method are adopted to achieve good prediction results in the fault fracture zone of DK7+812 to DK7+862;(2) The full-face curtain grouting method can effectively reduce the formation deformation caused by tunnel excavation in the tunnel construction in water-rich fault fracture zone, and the effect of water plugging is great;(3) According to the formula of thick wall tube, the experience of grouting and water plugging in existing tunnels, and the comparison of finite element method, the thickness of curtain grouting ring should be greater than 5 m to meet the safety requirements. Considering the safety requirements and the reduction of curtain grouting ring in the operation period, the thickness of curtain grouting ring needs to be increased to 7 m.
会议名称:

IAECST-International Conference on Architecture,Civil and Hydraulic Engineering(ACHE 2019)

会议时间:

2019-12-20

会议地点:

中国广东广州

  • 专辑:

    工程科技Ⅱ辑

  • 专题:

    公路与水路运输

  • DOI:

    10.26914/c.cnkihy.2019.069505

  • 分类号:

    U455.49

  • 手机阅读
    即刻使用手机阅读
    第一步

    扫描二维码下载

    "移动知网-全球学术快报"客户端

    第二步

    打开“全球学术快报”

    点击首页左上角的扫描图标

    第三步

    扫描二维码

    手机同步阅读本篇文献

  • HTML阅读
  • CAJ下载
  • PDF下载

下载手机APP用APP扫此码同步阅读该篇文章

下载:2 页码:144-152 页数:9 大小:947k

引文网络
  • 参考文献
  • 引证文献
  • 共引文献
  • 同被引文献
  • 二级参考文献
  • 二级引证文献
  • 批量下载
相关推荐
  • 相似文献
  • 读者推荐
  • 相关基金文献
  • 相关法规
  • 关联作者
  • 相关视频