文献知网节
  • 记笔记
摘要:The problems of the frame-fixed row-pattern pile cofferdam structure construction are analyzed based on the correlative situation of cofferdam in Haigang district of Binzhou port for liquid bulk cargo operation.According to the problem,two schemes to optimize the frame-fixed row-pattern pile cofferdam structure are proposed.After the calculation and analysis of the bearing capacity of PHC pile,the scheme of changing pile diameter or pile length is proposed.The two schemes are compared economically and the optimal scheme is determined,in the hope that this scheme can be used as a reference for later construction.
会议名称:

2018 7th International Conference on Advanced Materials and Computer Science(ICAMCS 2018)

会议时间:

2018-12-21

会议地点:

中国辽宁大连

  • 专辑:

    工程科技Ⅱ辑

  • 专题:

    公路与水路运输; 水利水电工程

  • 分类号:

    U655.54

  • 手机阅读
    即刻使用手机阅读
    第一步

    扫描二维码下载

    "移动知网-全球学术快报"客户端

    第二步

    打开“全球学术快报”

    点击首页左上角的扫描图标

    第三步

    扫描二维码

    手机同步阅读本篇文献

  • CAJ下载
  • PDF下载

下载手机APP用APP扫此码同步阅读该篇文章

下载:5 页码:290-295 页数:6 大小:904k

引文网络
  • 参考文献
  • 引证文献
  • 共引文献
  • 同被引文献
  • 二级参考文献
  • 二级引证文献
  • 批量下载
相关推荐
  • 相似文献
  • 读者推荐
  • 相关基金文献
  • 相关法规
  • 关联作者
  • 相关视频