文献知网节
  • 记笔记

Improving ESTA and Implementing the Expert System of Substation Direct Current System Condition Evaluation

Zi-rong ZHANG1Qi-ming CUI1Shu-ting CUI2Kai LIANG1Hong-yu MENG1Xue WANG1Yang BAI1Su-long HUANG1Fu-kun LI1Yue LI1Xue ZHAO1Bo HUANG1Ni NI1Hui-wen CHEN1Pin-rui HUANG1

1. State Grid Anshan Electric Power Supply Company2. Tesla Delivery Center,Fremont, California

摘要:It makes possible that it can do basic uncertain inference and directly read/write some table contents of MySQL database with improved ESTA 4.5(Expert System Shell for Text Animation) based on Visual Prolog 6.3 and Windows, namely adding some uncertain inference functions and some interaction functions with MySQL to the ESTA. It put forward also an uncertain inference method in the ESTA 4.5 based on Visual Prolog 5.2 and Web. It had designed and implemented a condition evaluation expert system of substation DC(Direct Current) system based on the improved ESTA and the enterprise standards(Q/GDW 607-2011) of State Grid. The test shows that the uncertain inference of improved ESTA has feasibility, the interaction with MySQL simplifies some rules of writing and enhances flexibility of it, and the expert system is effective and practical.
会议名称:

2019 International Conference on Energy, Power, Environment and Computer Application(ICEPECA 2019)

会议时间:

2019-01-20

会议地点:

中国湖北武汉

  • 专辑:

    工程科技Ⅱ辑; 信息科技

  • 专题:

    电力工业; 自动化技术

  • 分类号:

    TM63;TP182

  • 手机阅读
    即刻使用手机阅读
    第一步

    扫描二维码下载

    "移动知网-全球学术快报"客户端

    第二步

    打开“全球学术快报”

    点击首页左上角的扫描图标

    第三步

    扫描二维码

    手机同步阅读本篇文献

  • CAJ下载
  • PDF下载

下载手机APP用APP扫此码同步阅读该篇文章

下载:3 页码:119-127 页数:9 大小:1191k

相关推荐
  • 相似文献
  • 读者推荐
  • 相关基金文献
  • 关联作者
  • 相关视频