文献知网节
  • 记笔记
摘要:In order to meet the requirement of time overhead of on-line setting and checking system of high voltage grid in coalmine,when the number of high voltage switches in high voltage grid of coalmine is more,it is necessary to solve the problem of reducing the time overhead of setting the relay protection of all high voltage switches in the whole mine high voltage power supply system.In order to improve the efficiency of setting calculation,this paper presents a parallel setting calculation method for high voltage power supply system in coalmine.According to the obtained topology analysis model,parallel setting calculation of all high-voltage switch branches of high-voltage power supply system in coalmine is realized based on the first-come first serve parallel scheduling strategy.The simulation results show that the proposed method can effectively reduce the time overhead and improve the computational efficiency.
会议名称:

The 2019 International Conference on Artificial Intelligence and Computer Science(AICS 2019)

会议时间:

2019-07-12

会议地点:

中国湖北武汉

  • 专辑:

    工程科技Ⅰ辑

  • 专题:

    矿业工程

  • DOI:

    10.26914/c.cnkihy.2019.048637

  • 分类号:

    TD611

  • 手机阅读
    即刻使用手机阅读
    第一步

    扫描二维码下载

    "移动知网-全球学术快报"客户端

    第二步

    打开“全球学术快报”

    点击首页左上角的扫描图标

    第三步

    扫描二维码

    手机同步阅读本篇文献

  • HTML阅读
  • CAJ下载
  • PDF下载

下载手机APP用APP扫此码同步阅读该篇文章

下载:5 页码:800-802 页数:3 大小:254k

引文网络
  • 参考文献
  • 引证文献
  • 共引文献
  • 同被引文献
  • 二级参考文献
  • 二级引证文献
  • 批量下载
相关推荐
  • 相似文献
  • 读者推荐
  • 相关基金文献
  • 相关法规
  • 关联作者
  • 相关视频