文献知网节
  • 记笔记

Key Technology of Reverse Excavation at Tunnel Portal

Yuwen Wang1Zhao Hu2Yongli Xie2Chao Wang1Kaicheng Hua1Jinxing Lai2Hongpeng Lai2Yaqiong Wang2Xiabing Yue2

1. Guangdong Huiqing Expressway Co.,Ltd.2. School of Highway,Chang'an University

摘要:Tunnel portal construction is often from the outside to the inside of the mountain.Under special conditions and requirements,it is necessary to construct from the inside to the outside of the mountain.The method is called reverse excavation in tunnel portal.To ensure the construction safety in reverse excavation,the stress and deformation characteristics of both forward excavation methods and reverse excavation methods were studied by numerical analysis.The results show that reverse excavation could not significantly increase the deformation and stress of surrounding rock,and even reduced the influence range of tunnel excavation on the stress and deformation of slope.Reverse excavation could also reduce the damage to the portal environment.When the tunnel was about to be cut through,in order to reduce the stress concentration on the slope,the final excavation length was recommended to being greater than 2.5 m.Reverse excavation was a kind of green construction.
会议名称:

The 6th International Conference on Environmental Science and Civil Engineering(ESCE 2020)

会议时间:

2020-01-04

会议地点:

中国江西南昌

  • 专辑:

    理工C(机电航空交通水利建筑能源)

  • 专题:

    公路与水路运输

  • DOI:

    10.26914/c.cnkihy.2020.003934

  • 分类号:

    U455.4

  • 手机阅读
    即刻使用手机阅读
    第一步

    扫描二维码下载

    "移动知网-全球学术快报"客户端

    第二步

    打开“全球学术快报”

    点击首页左上角的扫描图标

    第三步

    扫描二维码

    手机同步阅读本篇文献

  • HTML阅读
  • CAJ下载
  • PDF下载

下载手机APP用APP扫此码同步阅读该篇文章

下载:1 页码:1241-1245 页数:5 大小:263k

相关推荐
  • 相似文献
  • 读者推荐
  • 相关基金文献
  • 关联作者
  • 相关视频